China Quality Control Checklist: Avoid Bad Shipments
You cannot return 10,000 defective products from China. Quality control before shipment is non-negotiable.
Pre-Production Check
Confirm materials match your approved sample
Check production start date in writing
Get factory contact and expected completion date
In-Production Check
Ask for photos at 30% and 70% completion
Verify packaging materials match your spec
Check labeling and barcodes
Final Random Inspection (FRI)This is the most important step. A third-party inspector samples 32 pieces from your batch and checks:
Product appearance and finish
Function and safety tests
Barcode and packaging accuracy
Quantity count
Drop test if neededAQL 2.5 standard means: reject if more than 7 defects in 125 pieces checked.
Who Does the Inspection?
SGS, Bureau Veritas, Intertek: $200-$400 per day
Local QC companies: $100-$200 per day
Your sourcing agent: often included in commissionLet SourceChina handle your quality control before every shipment.
Comments